Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u314932087/domains/engefer.eng.br/public_html/wp-includes/functions.php on line 6121
SICOOB ENGECRED CIDADE EMPRESARIAL – Engefer Engenharia

PORTFÓLIO

OBRAS COMERCIAIS


OBRAS RESIDENCIAIS


OBRAS HOSPITALARES


SICOOB ENGECRED CIDADE EMPRESARIAL

Execução do pavimento superior e ampliação do pavimento térreo do Sicoob Engecred, no Condomínio Cidade Empresarial em Aparecida de Goiânia-GO.

Área total: 430,00 m². Tempo de execução: 2 meses e 24 dias entre setembro de 2017 e dezembro de 2017.

Comercial